RESIDENTIAL AREA AND RESETTLEMENT AREA OF VI TAN COMMUNE

Employer: Lien Minh Joint Stock Company Contract’s value: 176 billion dong Location: Hau Giang province Construction period: 2020 Work scope: Leveling, roads, coonections, rainwater drainage systems, water supply systems, fire protection systems, lighting systems, sidewalks, tress, parks, power supply system

Read More

GS METROCITY NHA BE

Employer: Vietnam Gs Industry One-Member Limited Liability Company Contract’s value: 78 billion dong Location: Nha Be, HCMC Construction period: 2020 – 2021 Work scope: Soft soil treatment, Main roads construction: A1, A3, A4, B13, Storm water drainage system, Waste water drainage, Water supply, Power Supply, Landscape, Lighting, Telecommunication system, Temporary traffic connection at intersection of…

Read More

LONG SON PETROCHEMICALS – PACKAGE F: PORT – SUPERSTRUCTURE WORKS

Employer: Long Son Petrochemicals Co.,ltd Contractor: Posco Engineering & Construction Co., Ltd (POSCO E&C) Contract’s value: 550 billion dong Location: Long Son, Ba Ria – Vung Tau Construction period: 9/2019 – 6/2021 Work scope: Heavy block erection (Pipecrack, Girder, slab, PC house), superstructure work (Pipe head cutting, formwork, rebar, concrete for beam – slab systems)…

Read More

CONSTRUCTION INFRASTRUCTURE FOR PHU MY 3 SPECIALIZED INDUSTRIAL PARK

Employer: Khoang San Thanh Binh JSC Contract’s value: – Package No.01: 406 billion dong – Package No.02: 124 billion dong – Package No.03: 84 billion dong – Package No.04: 91 billion dong Location: Ba Ria – Vung Tau Construction period: 2015 – 2020 Work scope: Road systems, grass and trees, Storm water drainage system, Waste…

Read More

AQUA CITY

Employer: Novaland Group Contract’s value: 155 billion dong Location: Long Hung Commune, TP. Bien Hoa, Dong Nai province Construction period: 2020 – 2022 Work scope: Construction of temporary works, roads and sidewalks, drainage systems,trees

Read More

BANG DUONG E&C’S ANNUAL SHAREHOLDERS MEETING 2019

At the meeting, Mr. Nguyen Dang Khoa CEO of Bang Duong E&C JSC reported the business results  in 2018. Although newly established in June 2018, with great efforts of the operating Board with the companion and support from the parent company (Bang Duong Company currently holds 54.91% of the shares), so Bang Duong E&C has achieved quite satisfactory…

Read More